To check your net metering application status, start with the utility account or interconnection portal that received your paperwork, then match your project to the utility’s current stage. Most utilities track applications by a project or reference number, and the status usually moves through review, approval, installation verification, and permission to operate. This guide shows you how to find that number, read the status, and follow up when progress stalls.
Gather Your Application Details First
Before you contact anyone, collect the documents that identify your project. Utilities rarely search by name alone, especially when several people in a service area have filed. Having the right identifiers on hand shortens the call or portal search considerably.
Shopping for one? See our guide: Dominion Power Net Metering (2026): How It Works and Who Benefits.
- Your application or project reference number, usually printed on the submission confirmation email.
- The service address and utility account number from your electric bill.
- The date you submitted the application and the name of the installer or contractor who filed it.
- System size in kilowatts (kW) and the inverter model, as listed on your interconnection request.
If you can’t find the confirmation email, check your installer’s records. Installers often file on the homeowner’s behalf and keep copies of every submission.
Check the Status Through the Utility Portal
Most utilities now run an online interconnection or distributed generation portal. Log in with your account, or use the project lookup tool that accepts a reference number. The portal typically shows the current stage and the date it was last updated.
Stage names vary, but you’ll usually see something close to these:
| Stage | What it usually means |
|---|---|
| Received or under review | The utility has your file and is checking it for completeness. |
| Engineering or technical review | The utility is evaluating grid impact, which can take the longest. |
| Approved to install | You or your installer can begin construction. |
| Inspection pending | The system is built and waiting for an inspection or witness test. |
| Permission to operate (PTO) | The utility has approved the system to run and net metering credits can begin. |
Some utilities list only a generic “in progress” label. If that’s the case, ask for the specific pending task and who owns it.
Follow Up When the Status Stalls
If the status hasn’t changed for longer than the utility’s published timeline, contact the interconnection or distributed generation department directly. Have your reference number ready and ask three specific questions: What stage is my project in? What is still needed from me or my installer? When is the next expected action?
Write down the representative’s name, the date, and any reference number you’re given for the call. If you email, keep the thread and reply within the same message chain so the history stays attached to your file.
Many delays come from missing items rather than utility backlogs. A missing single-line diagram, an unsigned interconnection agreement, or an incomplete inspection form can each freeze a file. Ask directly whether anything is incomplete before assuming the utility is slow.
For background on how credits begin once your system is approved, see Solar Net Metering Policy: How Your Rooftop Credits Work (Step-by-Step) and What Is Net Metering Program? How It Works for Home Solar Owners. If you’re in a utility territory with its own process, Sdg&e Net Metering Application: Step-by-Step Guide for Homeowners and Xcel Net Metering Program: How It Works and How to Get Credited walk through specific workflows.
Common Mistakes When Checking Status
- Searching with the wrong name or address, which can return no results even when the file exists.
- Assuming “submitted” means “approved.” Submission only starts the review clock.
- Waiting on the utility when the installer still owes a document or inspection request.
- Calling without your reference number, which often leads to longer hold times and repeated questions.
- Ignoring a request for more information. Utilities may pause the file until they receive a reply.
FAQ
How long does a net metering application usually take?
Timelines depend on the utility and system size, and many publish target ranges on their website. Check the program rules for your area, since larger systems often face longer engineering reviews.
What if I don’t have my application reference number?
Ask your installer first, since they usually keep the full submission record. If they can’t help, call the utility with your account number and service address so a representative can locate the file.
Can I start installing before final approval?
Usually not. Most utilities require written approval to install before construction and permission to operate before the system is switched on. Installing early can delay or jeopardize your interconnection, so confirm the approval stage first.
Conclusion
Checking your net metering application status comes down to having the right reference number, reading the current stage in the utility portal, and following up with specific questions when progress stops. Keeping your installer and utility aligned prevents most delays. Because interconnection rules and fees vary by utility, confirm details with your utility or a licensed solar professional before making decisions.