Updated November 2026

A solar net metering online application is the form your utility uses to approve your home solar system and set up bill credits for the power you send back to the grid. This guide walks you through preparing the documents, filling out each section, submitting the request, and following up until your system is approved to operate. Most of the work is paperwork, so careful preparation saves weeks of back-and-forth.

Gather What You Need Before You Start

Most utilities ask for the same core information, so collect it before opening the portal. Having everything ready keeps you from saving a half-finished form and losing track of it.

Shopping for one? See our guide: Net Metering in Virginia vs Virginia Community Solar: Which Should You Choose?.

  1. Your utility account number and the service address exactly as it appears on your bill.
  2. A single-line electrical diagram showing panels, inverter, disconnect switches and the main service panel.
  3. The inverter and panel specifications from the equipment data sheets, including the total system capacity in kilowatts (kW) DC and AC.
  4. The name of your installer or, if you are doing the work yourself, the electrician who will sign off on the system.
  5. Proof of ownership or landlord permission if you rent.
  6. Any local building or electrical permit numbers already issued.

Complete the Application Sections Accurately

Online forms usually divide into customer information, system details, and equipment. Enter the system size using the same number on your diagram and data sheets. A mismatch between the form and the attached drawings is the most common reason for a request to be returned.

Customer and Site Information

Use your legal name as it appears on the utility account. Confirm the meter number and whether the home has a single meter or a separate meter for the solar system.

System and Equipment Details

List each inverter model and the number of panels. Upload the single-line diagram as a PDF if the portal asks for one. Keep file names simple so the reviewer can match them to the form fields.

Submit and Track Your Request

After submitting, you should receive a confirmation or application number. Save it, along with the date and time, in case you need to call. Utilities typically review the application first for completeness, then for engineering, and some require an inspection before the meter is changed. Timelines differ by utility, so check the provider’s published schedule instead of relying on a general estimate.

Do not turn on the system until you have written permission to operate. Operating early can violate your interconnection agreement and delay your credits. For a broader view of how credits are calculated once you are approved, see What Is Solar Net Metering? A Homeowner's Guide to Credits (2026).

A basic set of tools helps you fill out and check the paperwork. Use these items when preparing diagrams and documents.

  • A clipboard and printed copy of your utility’s application checklist, so you can tick off each document before uploading.
  • A multimeter for confirming voltage and polarity values you list on the equipment sheet. View on Amazon

Common Mistakes

  • Entering a system size on the form that does not match the diagram or equipment data sheets.
  • Submitting a diagram with missing disconnect switches or unlabeled breakers.
  • Forgetting to update the form after changing inverters or adding panels.
  • Operating the system before receiving approval to interconnect.
  • Using an old account number from a previous address.

FAQ

How long does a solar net metering online application take to approve?

Timelines vary by utility and depend on whether an inspection or meter change is required. Check your utility’s posted process and keep your confirmation number for follow-up calls.

Can I apply if I rent my home?

Many utilities accept applications from renters with written permission from the property owner. Confirm the requirement before you submit.

What if my application is rejected?

Utilities usually send a reason for the return. Correct the listed items, re-upload the documents, and resubmit under the same application number if the portal allows it. For the requirements that most often cause returns, see Solar Net Metering Requirements: What You Need to Qualify (Step-by-Step).

Conclusion

A solar net metering online application is manageable when you collect documents first and keep every number consistent across the form and drawings. Submit a complete package, save your confirmation, and wait for written approval before turning the system on. That approach keeps your credits on track from the start.