Updated November 2026
The dominion energy net metering program lets homeowners with rooftop or small ground-mounted solar send surplus electricity to the grid and receive bill credits for it. This guide walks through how those credits are calculated, what you need before applying, and how to avoid the paperwork delays that trip up many first-time applicants. Read it before you sign an installation contract so you know what to expect from the utility.
How Net Metering Credits Work
Under net metering, your meter runs in both directions. When your panels produce more than your home uses, the extra electricity flows to the grid and the meter turns backward. When your home draws more than your panels produce, such as at night, you pull power from the grid as usual. Your bill reflects the net difference over the billing period.
Dominion Energy generally credits exported energy at the retail rate for the period, which is why net metering is valued by many solar owners. Check your specific rate schedule, because credit treatment can differ between residential, small commercial and time-of-use plans.
Before You Apply: Eligibility and System Requirements
Eligibility depends on the type of system, its size and whether it is grid-tied. Systems are generally limited to a size relative to your historical usage, and the utility will review the design to confirm it meets its interconnection standards. Systems that feed a battery may follow different rules, so confirm with the utility before adding storage.
Gather these items before you start:
- Your Dominion Energy account number and the service address on the meter
- Twelve months of electric bills, so the utility can estimate your usage
- The system design, including panel count, inverter model and total DC capacity in kilowatts
- A licensed installer’s contact details and the electrician’s license number
- Proof of building or HOA approval where required
Step-by-Step: Applying and Getting Credited
- Request an interconnection application. Submit it through the utility’s online portal or the form listed on its distributed generation page. Include your system specifications exactly as your installer designed them.
- Wait for engineering review. The utility checks whether your system can safely connect to the local circuit. Smaller systems usually move through a faster review than larger ones.
- Install the system and schedule inspection. Your local building inspector signs off first. Then the utility or its representative inspects the connection.
- Receive permission to operate (PTO). Do not energize the system until you have written approval. Operating early can void your interconnection agreement.
- Replace or confirm the meter. Dominion Energy may install a bidirectional meter. Confirm the change is complete before expecting credits.
- Check your first bills. Look for the export line items and net credit amounts. If credits look wrong, call the utility with your billing dates ready.
Reading Your Bill After Installation
Your first few bills after permission to operate are worth reviewing closely. Compare the energy you imported from the grid with the energy you exported, and confirm that any excess credit carries forward correctly. Keep a simple spreadsheet of monthly production from your inverter app next to the utility’s figures, so discrepancies are easy to spot. For a deeper look at how true-up periods work, see Net Energy Metering True-up: How It Works and What Homeowners Should Check.
If you are weighing whether net metering or a battery makes more sense for your home, Dominion Energy Net Metering vs Battery Backup: Which Should You Choose? compares the two in detail. Virginia homeowners may also find Dominion Energy Net Metering Virginia (2026): Which Option Fits Your Home? useful, and the general Dominion Net Metering Program: How It Works and How to Apply (2026) covers related application details.
Common Mistakes
- Energizing the system before receiving written permission to operate.
- Submitting an application with panel counts or inverter details that don’t match the installed equipment.
- Ignoring bill changes for several months, which makes credit disputes harder to resolve.
- Adding a battery or expanding the array without notifying the utility first.
- Assuming your rate plan is unchanged after installation. Ask whether a different plan would suit your usage better.
Recommended Gear
A monitoring device helps you verify that production matches what the utility reports. Look for a compatible inverter monitoring kit or a whole-home energy monitor that tracks solar generation.
- A whole-home energy monitor that shows solar production and grid import in real time. View on Amazon
- A clamp-on power meter for checking individual circuits during commissioning. View on Amazon
FAQ
Do I need a battery to participate in the Dominion Energy net metering program?
No. Grid-tied solar without a battery can participate, though battery systems may follow separate interconnection rules. Confirm the requirements with the utility before adding storage.
How long does the approval process take?
Timelines vary with system size and utility workload. Smaller residential systems typically move faster than larger ones, so ask the utility for its current estimate when you submit your application.
What happens to credits I don’t use?
Excess credits generally carry forward to later billing periods, subject to the utility’s true-up rules. Check your rate schedule for the exact treatment and the timing of any annual settlement.
Conclusion
The dominion energy net metering program can turn surplus solar into bill credits if you prepare the right documents and wait for approval before operating your system. Keep records of your application, production and bills so you can catch errors early. Consult your installer or a licensed electrician for any design or electrical questions.