If you are replacing your roof and want solar panels on it, the sensible approach in the UK is to sort out the roof first, plan the solar layout around it, and then arrange the installation in the right order. This guide walks you through that sequence, from checking your roof’s condition to deciding whether the panels should go back on the old structure or be fitted to a new one. By the end you will know what to ask your roofer and installer, and where the common pitfalls are.

Why the Order of Work Matters

A new roof with solar panels UK projects usually fall into one of two patterns. Either the roof is replaced first and the panels are added later, or the solar system is fitted and then the roof is stripped around it. The first route is almost always the better one. Solar panels are typically expected to last 25 years or more according to most manufacturers’ performance warranties, and roof coverings often need replacing sooner. Fitting panels to a roof that needs work within a few years means taking the array off again, which adds labour and risk.

Shopping for one? See our guide: How Much to Install Solar Panels on Roof UK: 3 Best Guides Compared (2026).

Replacing the roof first also gives you a chance to design the roof around solar. You can choose the pitch, orientation and roof covering with panel mounting in mind, rather than working around whatever was there before.

Step 1: Assess the Condition of Your Existing Roof

Before you commit to anything, get a clear view of how much life your current roof has left. Look for slipped or cracked tiles, lifted ridges, damp patches in the loft, sagging timbers and failed flashing around chimneys and roof lights. A roofer can usually tell you within a short visit whether a repair will last or whether replacement is the better long-term move.

Pay attention to the roof structure as well as the covering. Solar arrays add weight, typically in the region of 11 to 15 kg per square metre once frames and panels are included, plus wind uplift loads. Your roofer or a structural engineer should confirm that the rafters and battens can take that load, particularly if you have an older property with smaller timber sizes.

Step 2: Decide on Roof Covering and Structure

The roof covering you choose affects how panels will be fixed. Each type has its own mounting approach, and some are easier to work with than others.

Roof type How panels are typically fixed Things to check
Concrete or clay tiles Hook or rail brackets fixed to the rafters through the tiles Tile profile compatibility, rafter spacing, waterproof seals
Slate Specialist slate hooks or rail systems Slate condition, fragility, roofer experience
Standing seam or profiled metal Clamps attached to the seams or roof sheets Seam type, manufacturer guidance on loads
Flat roof Ballasted frames or fixed frames with a membrane-safe base Drainage, membrane warranty, access and wind exposure

If you are considering a flat roof, our guide on Solar Panels Flat Roof UK: A Step-by-Step Guide for Homeowners covers the specific mounting and waterproofing issues. For metal options, see Top 6 New Roofs for Solar Panels Options for Metal, Shingle and Flat Roofs for a comparison of covering types.

Ask whether the roof will be built with integrated panels in mind. Roof Integrated Solar Panels UK: How They Work and What to Check First explains the trade-offs of panels that replace the roof covering rather than sitting on top of it.

Step 3: Plan the Panel Layout Before the Roof Goes On

Orientation and pitch decide how much electricity your array will produce. In the UK, south-facing roofs generally perform best, with east and west still producing well. A pitch between about 30 and 40 degrees is often cited as a good balance for year-round output, although the right figure depends on your location and roof shape. Our article on What Is the Best Roof Angle for Solar Panels? 6 Mounts Compared (2026) goes into the detail.

Ask your installer for a shading survey. Chimneys, neighbouring buildings and trees can cut output significantly, and it is much easier to plan around them now than after the roof is finished. Mark the proposed array area on a roof plan and confirm there is clear space for cable runs from the array to the inverter.

Step 4: Coordinate the Roofer and Solar Installer

Where possible, use one main contractor or agree a clear handover between the roofer and the solar installer. The usual sequence is:

  1. Roofer strips the old covering and inspects the timbers.
  2. Any structural repairs are completed and signed off.
  3. Battens and membrane are laid, with mounting points or rail positions marked.
  4. The new covering goes on, with pre-planned fixing points.
  5. The solar installer fixes the mounting system, panels, inverter and cabling.
  6. The system is tested, commissioned and registered for the Smart Export Guarantee where applicable.

Agree in writing who is responsible for flashings and penetrations. Gaps here are a frequent source of leaks, and both trades may point at the other if something goes wrong.

Step 5: Check Permissions, Warranties and Insurance

Most solar panel installations on domestic roofs in England and Wales fall under permitted development, but there are exceptions, especially in conservation areas, listed buildings or where the panels would protrude above the highest part of the roof. Check with your local planning authority if you are unsure. Scottish and Northern Irish rules differ, so confirm locally.

Ask your roofer for a written workmanship warranty and check that your solar installer is MCS certified. Let your home insurer know about the work, as roof replacements and new electrical generation equipment can affect your policy. Check the warranty on both the roof covering and the mounting system, since some roof warranties are voided by non-approved fixings.

Step 6: Plan for Electrical and Grid Connection

Your installer will need to connect the system to your consumer unit and notify your Distribution Network Operator. If your home is served by a cable that is already at capacity, additional upgrades may be needed. Ask your installer to check the supply and consumer unit before work starts. Keep all certificates, including the electrical installation certificate, in a safe place for future sales or insurance claims.

Checklist Before You Sign

  • Structural survey confirming the roof can take added load
  • Written roof and solar warranties, with compatible fixings confirmed
  • Shading and orientation assessment with a proposed layout
  • MCS certification for the solar installer
  • Agreed responsibility for flashings, penetrations and waterproofing
  • Planning position confirmed for your property type and location
  • Insurance provider informed of the work
  • Written timetable showing the order of trades

Common Mistakes

  • Fitting panels to an ageing roof. If the covering is near the end of its life, you may end up removing the array. Solar panels are often built to last 25 years or more, so match the roof’s remaining life to that expectation.
  • Skipping the structural check. Assuming the rafters are fine because the roof has been stable for years can be risky with added weight and wind uplift.
  • Using generic mounting brackets. Non-approved fixings can void warranties and fail under load.
  • Ignoring shade from nearby trees. Trees grow, so consider future shading as well as current conditions.
  • Letting two trades work without a plan. Ambiguity over who seals penetrations is a common cause of leaks.

Tips for a Smoother Project

  • Get at least three written survey reports so you can compare structural and layout recommendations.
  • Photograph the roof before and after each stage. This helps if a warranty claim comes up later.
  • Ask for the panel and inverter datasheets and check the warranty terms for each.
  • Book the work for a dry period. Heavy rain can delay membrane and flashing work.

For homeowners who want to check their roof and system during the project, a few simple tools are useful:

  • Fluke 117 Electrician’s Multimeter is a widely used meter for checking voltage and continuity on the DC and AC side of a system, though most testing should be left to the installer. View on Amazon
  • Klein Tools Non-Contact Voltage Tester helps you confirm a cable is dead before anyone works near it. View on Amazon
  • Stanley FatMax Tape Measure is useful for measuring rafter spacing and roof dimensions when you are preparing questions for your installer. View on Amazon

FAQ

Can I have solar panels fitted to a new roof straight away?

Yes, but it is usually better to wait until the roof is finished and inspected. Fitting panels during the build lets you use proper mounting points and avoid fixing through fresh membrane more than necessary.

Do I need planning permission for solar panels on a new roof?

Often not, under permitted development. Conservation areas, listed buildings and some layouts that stick out above the roofline may need consent. Check with your local planning authority.

How much weight can a standard UK roof carry?

It depends on the rafter size, spacing and condition. A structural engineer or experienced roofer should assess this. Do not assume an older roof can take extra load without checking.

Should the solar panels or the roof come first?

In most cases the roof should come first, especially if it is more than a few years from needing replacement. Replacing it later means removing and refitting the array.

Will solar panels void my roof warranty?

They can if non-approved fixings or poor flashing work are used. Check both warranties and ask the installer to confirm the mounting system is compatible with your roof covering.

Do I need to tell my insurer?

Yes, it is sensible to tell your insurer about both the roof replacement and the solar installation, as changes to the property can affect cover.

Is this advice a substitute for a professional survey?

No. Structural, electrical and roofing questions should be answered by qualified professionals such as a chartered surveyor, structural engineer, MCS-certified installer and a registered roofer.

Conclusion

A new roof with solar panels in the UK works best when the roof is sound, the structure has been checked, and the roofer and solar installer agree a clear plan before work starts. Replacing the roof first and designing the array around it saves time and avoids costly rework later. Get written surveys, check the warranties and keep a record of the work, and you will end up with a roof that is ready for solar for decades to come.

Claire Whitaker

About Claire Whitaker

Claire Whitaker is part of our editorial team and reviews and edits our home solar guides, checking product details against manufacturer specifications and owner feedback.